Questions we're frequently asked at Pro Assist Garage Conversions

How long does a SIP garden room take to build?

- Pro Assist Garage Conversions

The shell goes up quickly, often within days once the base is ready, because the panels arrive cut to size. The overall programme is set by groundworks, glazing lead times, the electrical run from the house and the internal finish. Design and manufacture also take time before anything appears on site.

Opening Times

  • Mon: 8:30-5:00pm
  • Tue: 8:30-5:00pm
  • Wed: 8:30-5:00pm
  • Thu: 8:30-5:00pm
  • Fri: 8:30-5:00pm
  • Sat: Closed
  • Sun: Closed

Visit Us

22 Beancroft Road
Marston Moretaine
Bedford
MK43 0PY

Speak to our team

Email us