How long does a self-contained garage conversion take?

- Pro Assist Garage Conversions

The construction phase is usually measured in weeks rather than months. The approvals add time at the front end: a planning application commonly takes around eight weeks to determine, and building regulations drawings need preparing before that. Homeowners who start the design early tend to hit their target dates. Those who start with the build date and work backwards tend not to.